Welcome to Beach House Build
Follow us as we build a family beach house.
Week 25 progress
At the start of the week, the electrician fixed a few things including the power in the living and main bathroom, and the stove top. The plumber also fixed the
Week 24 progress
Well lots of things were finished off in Week 24. Last week, the building surveyor picked up some things including covering the subfloor wood, making sure any steel is well covered for
Week 23 progress
Well we are getting close now. Lots of bits are being finished off. One of the main things has been the down pipes. Instead of a down pipe by the
Week 22 progress
The builder rang at the start of the week to say that the beach house would be finished by the end of the week, with the building surveyors arranged to
Week 21 progress
Well last week the builder said that everything would be finished this week. I had my doubts and unfortunately with part of the onsite wastewater system still MIA between Queensland
Week 20 progress
Finally with Week 20 we have had progress again. In preparation for the diggers due to come next week for the online wastewater installation, the shed nearest the front of
Week 19 progress
At the end of the week, the bench tops were due to be finally installed. Unfortunately, they have again been delayed – sigh. With the bench delay, we did yet
Week 18 progress
Well not much to report this week. The builders are still waiting on the bench tops. In preparation of the bench tops we did more painting of the pressed tin
Week 17 progress
This week was mostly about the splash backs. The splash back was installed in the kitchen. It starts just after the fridge spot and goes all the way round the
Week 16 progress
Lots of little things added this week. On the outside most of the external lights were fitted, including a sensor light on the ramp. On the inside, the pressed tin