Week 15 progress

This week the rest of the flooring in the beach house was laid – carpet in the bedrooms and vinyl in the bathrooms. Here is Bedroom 2 with the new carpet.

The installation of safety vinyl in the bathrooms has meant that the vanities and showers could be added. The big gap between the shower and the vanity in the ensuite is for a heated towel rail. 

IMG_9176

The walls of the showers are SpaPanels. We chose their Calacatta Marble design.

For the ensuite, the shower has a sliding door that goes the full width of the room (1500mm).

IMG_9177

While in the main bathroom we have  a corner shower with a pivot door. 

IMG_9168

The painter has also been busy painting the door frames, skirting boards and window architraves. Here is the fully painted transom between the main area and the hallway.

Knobs were also added to the kitchen cupboards. 

While the weather was cold and wet when we visited, the beach house was really cosy, which was impressive since there is no electricity/heating yet. It was very peaceful watching the stormy weather outside from the comfort of the beach house, even without furnishings.

So that’s the end of Week 15. 